Once the pile caps were finished, next job was to attach all the vertical rebar steel to the pile cap. This was to prepare the ground floor columns for shuttering and concreting once the plinth beam had been cast.
After a lot of time, all the rebar was placed and the construction site took on the appearance of a hedgehog!